Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning And Operation; Making Presettings - Aventics CMS, B-Design Betriebsanleitung

Vorschau ausblenden Andere Handbücher für CMS, B-Design:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
VS HF03 LG grounding
A
B
AVENTICS | DeviceNet | R499050019–BDL–001–AD
2
Fig. 7:
FE connection on the VS HF04 with bus coupler on the EP end
plate (1) or an E end plate (2)
O
Affix the grounding on the FE connection of the E end plate (2).
7

Commissioning and Operation

7.1

Making presettings

The following presettings have to be made:
W
Setting the baud rate
W
Setting the bus coupler address
W
Setting the diagnostic messages
W
Assigning the valve supply
W
Setting the bus terminator
All of these settings are made using the switches beneath the
PG fittings A and B.
Proceed as follows for all of the presettings:
1. Remove the corresponding PG fitting.
2. Adjust the corresponding setting as described below.
3. Refit the PG fitting in its original position. Pay attention that
the sealing rings are positioned correctly.
Commissioning and Operation
1
105

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis