Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Bus Coupler As A Final Station - Aventics CMS, B-Design Betriebsanleitung

Vorschau ausblenden Andere Handbücher für CMS, B-Design:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
1
2
AVENTICS | DeviceNet | R499050019–BDL–001–AD
data lines from terminal interference.
Ensure that the plug housing is securely fitted to the bus
coupler housing.
6.3.3

Connecting the bus coupler as a final station

1. Set up the correct pin assignment (see Tab. 5 on page 98) on
the plug connections if you do not use pre-assembled wiring.
2. Connect the incoming bus connection only to X71 (1).
3. Remove the PG fitting B.
4. Terminate the bus with switch S8 (switch in the "ON" position)
with the internal bus terminator (see "Setting the bus
terminator" on page 114).
5. Screw the PG fitting B back in. Pay attention that the sealing
ring is positioned correctly.
6. Cover the X72 (BUS OUT) socket with a protective cap (2).
7. Connect the shield on both sides of the bus cable directly to
the plug housing (EMC housing) if non-pre-assembled
cables and plugs with metal housing are used. This protects
data lines from terminal interference.
Ensure that the plug housing is securely fitted to the bus
coupler housing.
A potential equalization line of at least 10 mm
between the devices to avoid compensating currents from
flowing over the shield of the bus cable.
99
Assembly
2
is needed

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis