AVENTICS | DeviceNet | R499050019–BDL–001–AD
Commissioning and Operation
Behavior after power on
O
Configure the bus system in accordance with your system
requirements, the specifications in the EDS, the
manufacturer's specifications, and all valid technical
standards, directives, and safety regulations.
Take the operator's documentation on configuring the bus
master into account.
7.3

Operating behavior

The behavior of the bus connection depends on the CAN and
DeviceNet characteristics as well as the I/O configuration.
As a "Group 2 Only Server" the bus coupler supports the
"Predefined Master Slave Connection Set" in accordance with
"DeviceNet Specification Volume I, Release 2.0".
7.4

Start-up behavior

After the assembly has been switched on (connecting the 24 V
logics supply), the hardware components are tested.
If the start-up test has been successfully completed and bus
voltage is available, the CAN controller is initialized according to
the presettings on the rotary and DIP switches.
A "Duplicate MAC ID Check" in accordance with the DeviceNet
specification is carried out at the end of the initialization stage
to check if there is a second participant with the same MAC ID
on the bus system.
The participant can then be initialized by a DeviceNet master.
If an error is found, the bus coupler is stopped (see "System
stop" on page 121).