Herunterladen Inhalt Inhalt Diese Seite drucken

Evaporative Emission Control System - MOTO GUZZI V10 CENTAURO Werkstatt-Handbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

12.14 EVAPORATIVE EMISSION CONTROL SYSTEM (USA-SGP)
3
TO THE TANK
TO THE CANISTER
V10 CENTAURO
NOTE: The anti-overturning valve Ref. «1» should be vertically installed at ± 30° as regards the
exhaust gas inlet located as shown in figure.
1
Check valve
2
Pipe (Ø6x12)
3
Clamp
4
Pressure valve
5
Pipe (Ø8x14)
6
Three-way union
7
Three-way union
8
Carbon canister
9
Rubber spacer
10 Clamp
11 Clamp
12 Union on the intake pipes
13 Warning plate for vehicle use
14 R.H. thermic insulating material
15 L.H. thermic insulating material
13
2
1
3
4
3
2
2
12
7
3
9
Dx Sx
11
5
14 - 15
3
11
2
3
3
2
3
2
3
12
10
8
11
3
2
6
5
11
8
3
3
2
7
3
5
11
119

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Daytona rsSport 1100 i

Inhaltsverzeichnis