Herunterladen Inhalt Inhalt Diese Seite drucken

MOTO GUZZI V10 CENTAURO Werkstatt-Handbuch Seite 135

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

From inside the box, slide out the wheel pivot spacer «A» - Fig. 15-08, remove roller cage «B» - Fig. 15-08 and,
using extractor, code 12 90 71 00, remove the external needle bearing track «C» - Fig. 15-08 from inside the box.
Extract through the side flange of the transmission box the gear group crown-hollow shaft «D» - Fig. 15-09.
Extract the fixing screws «E» - Fig. 14-09 fixing the crown to the hollow shaft.
Remove the internal needle bearing track «F» - Fig. 15-10 using extractor «G» - Fig. 15-10, code 17 94 83 60.
E
Disassemble the conical pinion support unit.
Remove the seeger ring «A» - Fig. 15-11 and sealing ring «B» - Fig. 15-11; using the correct blocking instrument
«C» - Fig. 15-12 of the pinion unit, code 12 90 71 00, loosen sealing nut «D» - Fig. 15-12.
B
C
B
A
15-08
D
15-09
A
15-11
F
D
C
G
15-10
15-12
133

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Daytona rsSport 1100 i

Inhaltsverzeichnis