CHLORIDE 70-NET 10 - 40KVA
INSTALLATION
4. INSTALLATION
4.1. ELECTRICAL PREPARATIONS
In order to guarantee safe working conditions, ensure all voltage sources are isolated be-
fore carrying out the power connections. ENSURE CORRECT POLARITY!
It must be ensured that the live input source cannot accidentally be connected to the UPS during installation.
ENG
Notice
Installation may only be carried out by qualified technicians and in conformity with the applicable
safety standards.
For electrical installation, the nominal current rating of the source must be observed
4.2. SCHEMATIC DIAGRAMS
Figure 6 -
Front 10/15/20kVA (left) and 30/40 kVA (right)
User Handbook - 10H52163PAMC rev.9 - 06/2008
Page 13