CHLORIDE 70-NET 10 - 40KVA
3.7. FLOOR
The floor must be even and level.
3.8. INSTALLATION SITE
It is necessary to leave the following minimum spaces around the UPS, to allow the flow of
air. Routine maintenance operations may involve removal of the panels (see fig. 5). Space-
must be provided to permit the unit to be rolled back and forth.
User Handbook - 10H52163PAMC rev.9 - 06/2008
Figure 4 - Floor space
Minimum
500mm
above unit
Figure 5 - Cabinet spacing
PREPARATION FOR USE
Page 11
ENG