CHLORIDE 70-NET 10 - 40KVA
3. PREPARATION FOR USE
3.1. TRANSPORT
The equipment must be kept upright at all times and handled with care, damage may be
caused if dropped or subjected to severe impact.
3.2. DELIVERY AND STORAGE
The goods have been checked thoroughly before dispatch. On receipt check the packaging
and ensure that the contents are undamaged. Any damage or missing parts must be report-
ed to the supplier within 8 days of delivery.
3.3. UNPACKING
The utmost care shall be taken when removing the packaging in order to avoid damaging
the equipment. Check all packaging materials to ensure that no items are discarded. Re-
move the packaging according to the sequence illustrated in fig. 1 and fig. 2.
User Handbook - 10H52163PAMC rev.9 - 06/2008
Figure 1 - Unpacking - Step1
Figure 2 - Unpacking - Step2
PREPARATION FOR USE
ENG
Page 9