Herunterladen Inhalt Inhalt Diese Seite drucken

FLEISCHMANN TRAIN-NAVIGATION6893 Handbuch Seite 128

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Basically there is a certain sequence to consider when working out the commands of the
individual switching operations:
1. Are the accessories or route commands to be sent? If yes: execute the command
2. Should there be a programmed waiting time as per LNCV5 (see below)
3. Are individual speed commands to be sent? If yes: execute the command
4. Are individual function commands to be sent? If yes: execute the command
Time delay to switch electrical accessories
If there are to be complete routes of points set as the vehicle first starts off, then it is not real-
ly feasible if the vehicle starts off straight away, immediately after sending out the signals.
The selected routes may not necessarily be ready and the points could still be changing. In
order to give a time delay, an additional waiting time can be entered in LNCV5, so that the
navigation receiver waits before sending out the accessory or route commands until the
speed commands have first been executed.
LNCV
Name
5
Accessory wait
And here's how it's done:
After calling up the desired navigation receiver to program the time delay, you will have
in the display LNCV0 with the module-address, the cursor will be blinking at position 0
Select LNCV-Nr. 5 for the time delay
Continue with the [→]-key to the enter the time delay
Enter the time delay in seconds between 0 and 255
Confirm with the [↵] key
Using the [←] key, go back to LNCV-selection
Once the programming is complete, exit with the [menu] key, or step by step with the
[←] key.
Advice
Once the loco has passed the green signal, the navigation receiver must be informed so
that it knows when it is free to carry out the next action. This will happen once the sig-
nal is set back to red, either manually (on the TWIN-CENTER) or by another navigation
receiver or automatically corresponding to chapter 8.4.5.
Example: Time controlled shuttle stretch with route selection and switch functions
Ablauf:
Sequence:
Diagram 11: Time controlled shuttle stretch with route selection and switch functions
128
Value
Description
0 – 255
Waiting time to execute the accessory/route,
entry in seconds

Werbung

Kapitel

Inhaltsverzeichnis
loading

Verwandte Produkte für FLEISCHMANN TRAIN-NAVIGATION6893

Inhaltsverzeichnis