Herunterladen Diese Seite drucken

RK Rose+Krieger Gesamt RK MultiControl II duo Montageanleitung Seite 233

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8.5.1
Control RK MultiControl II duo/RK MultiControl II quadro
'Commissioning' menu
8.5.1.1
'Start the initialization' menu
Initialization run
◼ When commissioning the control unit for the first time
Carry out an initialization run in the following circumstances:
◼ When the number of connected drives is changed
◼ When resetting the control unit to factory settings
◼ Connecting 2 - 8 control units in order to move drives synchronously
◼ Message 'Start initialization?' appearing on the display screen
◼ Respective error message
◼ Activation of drive group management
In order to be able to move the drives, the initialization run
must be completed.
◼ The main menu for the hand switch is displayed
Prerequisite:
Selecting a menu
Select the menu via 'Control' → 'Commissioning' → 'Start the initializa-
1.
tion' (Figure 69).
page 281
page 235
Figure 69 - Selecting a menu
8.3 on page 215.
233

Werbung

loading

Verwandte Produkte für RK Rose+Krieger Gesamt RK MultiControl II duo

Diese Anleitung auch für:

Gesamt rk multicontrol ii quadro