Herunterladen Diese Seite drucken

Grundfos NK Montage- Und Betriebsanleitung Seite 10

Vorschau ausblenden Andere Handbücher für NK:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 118
English (GB) Installation and operating instructions
Original installation and operating instructions.
CONTENTS
1.
Symbols used in this document
2.
General information
3.
Delivery and handling
3.1
Delivery
3.2
Handling
4.
Identification
4.1
Nameplate
4.2
Type key
4.3
Impeller diameter
4.4
Pumped liquids
5.
Technical data
5.1
Ambient temperature
5.2
Liquid temperature
5.3
Operating pressure
5.4
Minimum inlet pressure
5.5
Maximum inlet pressure
5.6
Minimum flow rate
5.7
Maximum flow rate
5.8
Electrical data
5.9
Weight
5.10
Sound level
5.11
Pump speed relative to material and size
5.12
Belt drive
5.13
Operation with combustion engine
6.
Mechanical installation
6.1
Preparations before installation
6.2
Foundation and grouting of horizontally mounted NK,
NKG pumps with base frame
6.3
Alignment
6.3.1
General
6.3.2
How to align the unit
6.4
Pipework
6.4.1
Piping
6.4.2
Direct mounting in pipework
6.4.3
Bypass
6.5
Vibration dampening
6.5.1
Elimination of noise and vibrations
6.5.2
Vibration dampers
6.6
Expansion joints
6.7
Bearing bracket
6.7.1
Bearing bracket with automatic grease lubricators
6.7.2
Bearing bracket with constant-level oiler
6.8
Bearing monitoring
6.8.1
Vibration level
6.8.2
Temperature
6.9
Pressure monitoring
7.
Flange forces and torques
8.
Electrical connection
8.1
Motor protection
8.2
Frequency converter operation
9.
Start-up
9.1
General
9.2
Priming
9.3
Checking the direction of rotation
9.4
Start-up
9.5
Start/stop
9.6
Reference readings of monitoring equipment
10.
Maintenance
10.1
Pump
10.1.1 Mechanical shaft seals
10.1.2 Stuffing box
10.2
Lubrication of bearings in bearing bracket
10.2.1 Grease-lubricated bearings
10.2.2 Oil-lubricated bearings
10
10.3
Monitoring equipment
10.4
Motor
10.4.1 Lubrication
10.4.2 Bearing grease
Page
11.
Periods of inactivity and frost protection
10
12.
Service
11
12.1
Service kits
11
13.
Calculation of minimum inlet pressure
11
14.
Fault finding
11
15.
Disposal
11
11
Warning
12
Prior to installation, read these installation and
17
operating instructions. Installation and operation
17
must comply with local regulations and accepted
17
codes of good practice.
17
17
1. Symbols used in this document
17
17
Warning
17
17
If these safety instructions are not observed,
17
it may result in personal injury!
17
17
If these safety instructions are not observed,
Caution
17
it may result in malfunction or damage to the
18
equipment!
18
Notes or instructions that make the job easier
18
Note
and ensure safe operation.
18
18
19
22
22
22
25
25
25
26
26
26
26
26
27
27
27
28
28
28
28
29
30
30
30
31
31
31
31
31
31
31
32
32
32
32
32
32
33
33
33
33
33
33
34
34
34
35
36

Werbung

loading

Diese Anleitung auch für:

Nkg