4
| T E M P E R AT U R E P R O B E I N S TA L L AT I O N A N D S TA R T- U P G U I D E
Commissioning
Each probe needs to be commissioned as per the following procedures before it can
be used. Each probe has to be recognized one by one:
• connect the probe to the temperature probe input (one probe only)
• click on a row to assign a probe number
• click on the "Start" button
• the RVT recognize automatically the probe address
• restart the same procedure for each probe
When one of the probes has a problem, it can be cleared by clicking the clear button. A
unique address will be assigned to each activated probe after the recognition completes.
Hitachi Energy Belgium n.v.
Power Quality Products
Allée Centrale 10 Z.I. Jumet
B-6040 Charleroi (Jumet)
Belgium
Phone: +32(0) 71 250 811
Email (Marketing & Sales): power.quality@hitachienergy.com
Email (Service): service.jumet@hitachienergy.com
hitachienergy.com/power-capacitors
©Hitachi Energy 2022. All rights reserved.
Specifications subject to change without notice.
9AKK107045A9879 rev G | Oct 2022