Herunterladen Inhalt Inhalt Diese Seite drucken

Select The Best Location - Panasonic R32 Installationsanleitung

Vorschau ausblenden Andere Handbücher für R32:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 273

SELECT THE BEST LOCATION

1
Before choosing the installation site, obtain user approval.
Install the Tank Unit in indoors with frost free weather proof
location only.
Must install on a fl at horizontal and solid hard surface.
There should not be any heat source or steam near the
Tank Unit.
A place where air circulation in the room is good.
A place where drainage can be easily done
(e.g. Utility room).
A place where Tank Unit's operation noise will not cause
discomfort to the user.
A place where Tank Unit is far from door way.
A place where accessible for maintenance.
Ensure to keep minimum distance of spaces as illustrated
below from wall, ceiling, or other obstacles.
A place where fl ammable gas leaking might not occur.
Secure the Tank Unit to prevent it being knocked over
accidentally or during earthquakes.
Please avoid installations which expose the Tank Unit to any of the
following conditions:
Extraordinary environment conditions; installation in frost or
exposure to unfavorable weather conditions.
Voltage input exceeding the specifi ed voltage.
Required space for installation
(Unit : mm)
Transport and Handling
Be careful during transportating the unit so that it is not damaged
by impact.
Only remove the packaging material once it has reached it is
desired installation location.
It may need three or more people to
carry out the installation work. The weight
of Tank Unit might cause injury if carried
by one person.
The Tank Unit can be transported either
in vertical or horizontal.
- If it transported in horizontal, make
sure Front of packaging material
(printed with "FRONT") must facing
upwards.
- If it transported in vertical, use the
hand holes on sides, slide and
move to the desired location.
Fix the Adjustable Feet 1 , if the Tank unit installed on a uneven
surface.
6
1. Make a Ø70 mm through hole.
2. Insert the piping sleeve to the hole.
3. Fix the bushing to the sleeve.
4. Cut the sleeve until it extrudes about 15 mm from the wall.
5. Finish by sealing the sleeve with putty or caulking compound
WATER QUALITY REQUIREMENT
Hold
Hold
Hold arrow section
to slide and move
TO DRILL A HOLE IN THE
2
WALL AND INSTALL A
SLEEVE OF PIPING
CAUTION
When the wall is hollow, please be sure to use the sleeve for
tube assembly to prevent dangers caused by mice biting the
connection cable.
at the fi nal stage.
Wall
Outdoor
Indoor
Sleeve for tube
assembly
ø70 mm through hole
PIPING INSTALLATION
3
Must use water that complies with European water quality
standard 98/83 EC. The lifespan of the Tank Unit will be shorter if
groundwater (include spring water and well water) is used.
The Tank Unit shall not be used with the tap water containing
contaminants such as salt, acid, and other impurities which may
corrode the tank and its component.
Typical Piping Installation
Air-to-Water Heatpump
Outdoor Unit
Tank Water
Discharge
Tundish
15 mm
Approx. 5 - 7 mm
Bushing for tube assemblys
Putty or caulking compound
Temporary
Double
connection to
Check Valve
be removed
assembly is
immediately
acceptable
after fi lling
in house
Fan Coil Unit
Radiator /
Floor Heater
2-Way Valve
Expansion
Tab /
Vessel
Shower
Drain
Water
Main
Supply
Check
Shut
Pressure
Valve
Off
Reducing
Valve
Valve

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Wh-adc0309j3e5c

Inhaltsverzeichnis