Herunterladen Inhalt Inhalt Diese Seite drucken

Picking Up, Transporting And Putting Down Load Units - Jungheinrich DFG 316s Betriebsanleitung

Hubhöhe (standardteleskopmast) 2900-7500 mm
Vorschau ausblenden Andere Handbücher für DFG 316s:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

3.5
Picking up, transporting and putting
down load units
Qw W
The control lever may only be
operated from the driver seat.
IMPORTANT Before lifting a load unit, the
driver must be sure that it is
palletized correctly and does not
exceed
capacity of the vehicle.
Heed load diagram!
Adjusting forks
Qw W
The fork must be adjusted in
such a way that both fork arms
have the same distance to the
outside edges of the fork carrier
and the load center is centered
between the fork arms.
– Move locking lever (65) upward.
– Push the fork arms (66) on the fork
carrier (67) into the correct position.
– Move locking lever downward and
shift the fork arm until it rests in a
notch.
Picking up a load
– Carefully approach the load to be
picked up.
– Place direction of travel lever (29) in
neutral position.
– Place the parking brake switch (31) in
position I .
– Lift the forks to the appropriate height
relative to the load.
– Switch direction of travel lever into
forward drive and release parking
brake.
E 32
the
permitted
load

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Tfg 316sDfg 550sTfg-550s

Inhaltsverzeichnis