Extended shutdown of the industrial truck

If the industrial truck has to be shut down for more than two months – for operational
reasons, for example – it must be stored in a frost-free and dry area, and the actions
to be taken before, during and after shutdown must be undertaken as described.
IMPORTANT The industrial truck must be jacked up during shutdown so that no wheels are
in contact with the floor. This is the only way to ensure that the wheels and
wheel bearings are not damaged.
If the industrial truck is to be shut down for more than six months, the need for
additional measures must be determined in conjunction with the manufacturer's
customer service department.
14.1

Measures required before shutdown

– Clean the truck thoroughly.
– Check that the brake is working correctly.
– Check the hydraulic oil level and fill if necessary
(see Section "Hydraulic oil").
– Apply a thin film of oil or grease to all parts not protected by paint.
– Lubricate the industrial truck according to the lubrication plan
(see Section "Lubrication plan").
– Charge the battery starter.
– Disconnect the battery starter and clean it. Apply pole grease to the battery poles.
NOTICE
In addition, all instructions of the battery manufacturer must be followed.
– Spray all exposed electrical contacts with a suitable contact spray.