Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

EC5B0000

HANDLEBAR

Extent of removal:
Extent of removal
Preparation for removal
1
1 Handlebar removal
Order
Part name
HANDLEBAR REMOVAL
Headlight
1
Hot starter cable
2
Hot starter lever holder
3
Clutch cable
4
Clutch lever holder
5
Engine stop switch
6
Light switch
7
Brake master cylinder
8
Start switch
9
Throttle cable cap
10
Throttle cable #2 (pushed)
11
Throttle cable #1 (pulled)
12
Right grip
13
Tube guide
14
Grip cap cover
15
Left grip
16
Handlebar upper holder
17
Handlebar
HANDLEBAR
Q'ty
1
Disconnect at the lever side.
1
1
Disconnect at the lever side.
1
Disconnect the clutch switch lead.
1
Disconnect the engine stop switch lead.
1
1
Refer to "REMOVAL POINTS".
1
Disconnect the start switch lead.
1
1
Disconnect at the throttle side.
1
Disconnect at the throttle side.
1
Refer to "REMOVAL POINTS".
1
1
1
Refer to "REMOVAL POINTS".
2
1
5 - 91
CHAS
Remarks

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Wr250fr 2002

Inhaltsverzeichnis