Herunterladen Inhalt Inhalt Diese Seite drucken

Connection To (Sps) Control Systems - ECOLAB ULTRAX Cube Betriebsanleitung

Tcd dosiersystem
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.6.1

Connection to (SPS) control systems

The OGM
reprogrammed to NPN output if required.
If you use your own PLC cable instead of our prefabricated PLC cable, it is
imperative that a bridge is placed in the connector between PIN 3 and 2.
If this bridge is not present, malfunctions / failures may occur.
5.6.1.1 (PLC) control system with PNP input
A
Cable (5 m), Article-No. 418439006
(EBS-No. 10093156)
5.6.1.2 (PLC) control system with NPN input
A
Cable (5 m), Article-No. 418439006
(EBS-No. 10093156)
PLUS
is supplied with PNP output. However, it can be
B
A
B
A
B
Angular connector, Article-No. 280095
B
Angular connector, Article-No. 280095
29
Installation
417102208 Rev. 8-11.2019

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis