Herunterladen Diese Seite drucken

ECOLAB ULTRAX Cube Betriebsanleitung Seite 244

Tcd dosiersystem

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Assembly and connection
14
12
Fig. 15: Extending the valve block
9.
Unlock the retaining clamp
connection
10. Install the extension block with three solenoid valves on product valve P9 using a
coupling piece
11. Mount the grommet connection
12. Mount a closed threaded connection on the bottom of product valve P12.
13. Place the extended valve block on the support plate ( Fig. 14 ,
place with five mounting nuts.
14. Install the solenoid valve distributor block in reverse order.
15. Install additional strain relief screw fittings ( Fig. 13 ,
16. Connect product valves P10–P12 to the controller according to the circuit diagram.
MAN053089 Rev. 1-11.2023
10
11
13
on product valve P9
11
.
12
.
13
12
Product valve P9
10
Retaining clamp
11
Grommet connection
12
Coupling piece open
13
Product valve P12
14
and remove the grommet
10
on product valve P12
) on the mounting rail.
4
48
.
14
) and tighten it in
9

Werbung

loading