Herunterladen Diese Seite drucken

ECOLAB ULTRAX Cube Betriebsanleitung Seite 237

Tcd dosiersystem

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.3
Wall mounting
This ULTRAX Cube must be fixed to the wall using the supplied wall mounting. The
supplied dowels are to be used only in masonry walls.
Suitable special dowels must be used for lightweight partition walls.
Material:
2
Fig. 6: Mounting rail mounted on the unit
Requirements:
A mounting rail is located on the rear of the unit
n
bevelled edge
1.
Select a suitable mounting location, making sure that there is sufficient space to the
left and right of the unit:
Control cabinet
n
n
Water supply lines
Metering lines
n
n
Product canister
Fig. 7: Mounting the wall mounting
Mark the drill holes on the wall as shown in Fig. 7 and drill Æ8 mm holes.
2.
3.
Screw the mounting rail
4.
With the help of an assistant, place the unit on the mounting rail on the wall
the rear mounting bar ( Fig. 6 ,
n
Mounting rail (art. no. 37401602)
1
3
facing downwards.
3
1
4
3
onto the wall with the bevelled edge
2
Assembly and connection
Top of the unit
1
Mounting rail
2
Bevelled edge
3
(art. no. 37401602) with the
2
Top edge of the device
1
Mounting rail
2
Bevelled edge
3
Drill hole Æ8 mm
4
2
) and align it.
2
41
facing upwards.
3
using
2
MAN053089 Rev. 1-11.2023

Werbung

loading