Herunterladen Diese Seite drucken

ECOLAB ULTRAX Cube Betriebsanleitung Seite 386

Tcd dosiersystem

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

10
Decommissioning, disassembly, environmental protection
Personnel:
DANGER!
Risk of injury due to the disregard of the specified personal protective
equipment (PPE)!
For all disassembly work, please respect the use of the PSA which is
specified on the product data sheet.
10.1
Decommissioning
DANGER!
The procedures described here may only be carried out by skilled
personnel as described at the start of the chapter, this may only be done
using PPE.
To take the equipment out of operation, proceed as follows:
1.
Before carrying out any subsequent work, completely cut off the electrical supply first
and secure it against unintentional switch-on.
2.
Relieve internal pressure of the pump and line pressure in the metering system.
3.
Drain off metering medium from the entire system without leaving any residue.
4.
Drain and remove operating and auxiliary materials.
5.
Remove the remaining processing materials and dispose of them in an
environment-friendly way.
10.2
Dismantling
DANGER!
Dismantling may only be carried out by skilled personnel using PPE.
Before commencing dismantling, ensure that the device has been fully
isolated from the power supply. Contact with live components can be fatal.
Activated electrical components can make uncontrolled movements and
lead to serious injury.
Carefully rinse all components which come into contact with the product in
order to remove chemical residue.
WARNING!
Danger of injury in case of improper dismantling!
Stored residual energy, components with sharp edges, points and corners,
on and in the system, or on the required tools can cause injuries.
Decommissioning, disassembly, environmental protection
n
Operator
n
Mechanic
n
Service personnel
n
Specialist
35
417101113 Rev. 9-08.2019

Werbung

loading