Herunterladen Diese Seite drucken

ECOLAB ULTRAX Cube Betriebsanleitung Seite 325

Tcd dosiersystem

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation
5.1
Notes for installation
In order to avoid inclusions of air, the meter should be installed in a vertical
metering line and vented ("bled"). The use of a filter / strainer is necessary
if crystallizing products are to be metered.
5.2
Installation of connecting adapter
Fig. 2: Connecting adapter
Install the connecting adapter (pos. 1) available as an accessory for the OGM
input and output side of the Oval Gear Meter.
It must be ensured during this operation that the appurtenant O-ring seals (pos. 2) are
installed in the correct position.
The necessary connecting adapter (pos. 1) and the appurtenant O-ring seals (pos. 2) can
Ä Chapter 10 'Ordering code, Spare parts and accessories' on page 43.
be found in
"Ordering Code, Spare Parts and Accessories".
A pipeline can also be connected directly using an appropriate insert instead of the hose
connection fittings.
417102208 Rev. 8-11.2019
1
2
2
1
26
PLUS
on the

Werbung

loading