Herunterladen Diese Seite drucken

ECOLAB ULTRAX Cube Betriebsanleitung Seite 378

Tcd dosiersystem

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.5.1
Install the metering valves in the correct position
Fig. 7: Install the metering valves in the correct position
The direction of flow is marked by an impressed arrow on the suction/pressure valves.
WARNING!
When installing the valves, ensure that the flow direction is correct.
5.6
Electrical Connection
Personnel:
Create an electrical connection according to VDE regulations and guidelines from the
local electricity supply company. A suitable mains plug or pump control system must be
installed by the trained electrician.
n
Qualified electrician
27
Installing the device
417101113 Rev. 9-08.2019

Werbung

loading