Start-up steps
Requirements:
n
installation work has been completed.
n
The controller is connected according to the operator's specifications.
n
Operating media (water, chemicals for metering) are available.
1.
Remove the splash guard.
on page 63
2.
Bleed the product suction lines and diaphragm metering pump.
6.4 'Bleeding the metering pump and product lines' on page 54
3.
Perform calibration for all configured products.
on page 56
4.
Check the metering and rinsing times according to the results of the calibration;
adjust if necessary.
5.
Install the splash guard.
It is prohibited to operate the unit without the splash guard in place.
Ä Chapter 8.2 'Removing the splash guard'
Ä Chapter 6.5 'Perform calibration'