Herunterladen Inhalt Inhalt Diese Seite drucken

RK Rose+Krieger MultiControl II duo Montageanleitung Seite 185

Vorschau ausblenden Andere Handbücher für MultiControl II duo:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Carrying out drive group 2 initial-
ization run
Fig. 71: Carrying out an initialization
run
7.5.1.2.2
Activating drive group management after commissioning
Reloading factory settings
Fig. 72: "Reload factory settings"
menu
Setting the language
Fig. 73: Setting the language
20.08.2021
8.
Prerequisite:
n
The drives are connected to the MultiControl II quadro
152.
1.
2.
Control unit RK MultiControl II duo/RK MultiControl II quadro
Carry out the initialization run for the second drive group
Ä Compatible drives on page 180.
(
)
During initialization runs each drive group is moved
at the possible nominal speed of the connected
drives and stops when the limit switch is reached
separately.
On completion of the initialization runs the display
screen switches to "drive management" mode.
Reset the control unit to factory settings
Ä Page 179.
Setting the language
Operating the hand switch with 6 function buttons
Control menu > Commissioning menu
Ä Page 210.
Ä Page
185

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis