en
52 | ROLL R6 M | Commissioning
4.
Commissioning
4.1
Unpacking
1. Remove the steel band and fasteners.
2. Carefully lift off the packaging.
Fig. 7:
3. Remove the accessories and packaging material
from the packaging unit.
Fig. 8:
i
Check that the ROLL R6 M and the accessories are
in proper working order and that there are no visible
signs of component damage. In case of doubt, do
not start up the unit and consult customer service.
i
Remove the accessories and packaging material
from the packaging unit.
4.1.1
Machine movement
i
On delivery, the machine is fastened to the wooden
pallet with 3 bolts.
|
1 695 600 694
2016-09-28
Fig. 9:
1. Slacken off the 3 bolts with which the ROLL R6 M is
attached to the pallet.
2. Remove the dummy plug on the balance weight
storage tray.
Fig. 10:
3. Hand-tighten the threaded lug.
Fig. 11:
OMCN spa