Herunterladen Diese Seite drucken

HYVA TITAN Installationsanleitung Seite 8

Hookloader
Vorschau ausblenden Andere Handbücher für TITAN:

Werbung

T
T12/18
T20/22
T26/30-xx-S
T26/30-xx-SK
SUB FRAME EXTENSION
In case of an bottom frame extension the additional length is added to the front of the hookloader;
this results in the L, A, and C dimension in figure 2.4 increasing with the amount of extension.
Subject to change without notice
TITAN HOOKLOADER
INSTALLATION MANUAL
Figure 2.3 Showing sub-frame dimension designations
W1 = 1067 mm, W2 = 850mm, W3 = 630mm
40
42
45
47
47
47
Table 2.2 T dimension
50 mm
Figure 2.4 Hole height distance (x) of subframe
T12/18
X (mm)
40
Table 2.3 X dimension value
W3
W2
W1
T (mm)
49
51
53
55
130
49
51
53
55
160
49
51
53
55
160
49
51
53
55
160
40 mm
X
50 mm
T20/22
T26/30
70
100
8
57
60
62
57
60
62
65
57
60
62
65
190
57
60
62
65
190
OH-E HKL-0002 / 25-05-2020 / RV AB
UK
DE
FR
NL
ES
IT
PT
PL
CS
HU
NO
67
FI
67
DK
RO
RU
SK
SE

Werbung

loading