⇨ The LED display lights up green. The initialization run is complete. The control is
6.
Press and hold the
ready for operation.
180
button until all drives have moved into the upper final position.
If the upper final position cannot be reached or an upward stroke
limitation is to be set, the initialization run can be ended in any position.
To do so, press and hold the
new position for the upper final position of the drives is set.
Assembly instructions for the RK MultiControl II duo accu/DC control
button for approximately 5 seconds. The