Initialization run
◼ When commissioning the control for the first time
Carry out an initialization run in the following circumstances:
◼ When the number of connected drives is changed
◼ When resetting the control to factory settings
◼ Connecting 2 - 8 controls in order to move drives synchronously
◼ Corresponding error message
Carry out initialization
Staff:
◼ All drives and controls are connected to each other.
Prerequisite:
1.
Unplug the mains plug and wait for 30 seconds.
2.
Press and hold the
⇨ The LED display flashes red and green alternately.
3.
Plug in the mains plug and wait approximately 5 seconds.
4.
Release the
5.
Press and hold the
Assembly instructions for the RK MultiControl II duo accu/DC control
⮱
The IO interface module can be connected to the RK MultiControl
II duo accu/DC using the control BUS cable supplied.
◼ User
The system must be de-energised for at least 30 seconds.
buttons at the same time.
buttons.
button until all drives have moved into the lower final position.
"Table of error messages" on page 239.