Additional operator obligations
The operator is also responsible for ensuring that the RK MultiControl II duo accu/DC control
and the location of use are in a technically perfect condition at all times. Therefore, the following
◼ The operator must make sure that the required clearances and sufficient lighting are
applies:
available for safe working and make sure that the RK MultiControl II duo accu/DC
◼ The operator must make sure that the maintenance intervals described in these
control and the location of use are kept permanently clean and tidy.
◼ The operator must ensure that the maintenance intervals of the subcontracted
instructions are adhered to.
◼ The operator must make sure that the maintenance intervals described in this manual
components are adhered to.
◼ The operator must make sure that all work on the RK MultiControl II duo accu/DC
are adhered to.
control is carried out in a sufficiently air-conditioned room in which an excessively hot
or cold working environment is not expected.
3.5
Staff requirements
Insufficient qualification
Authorised staff
The different tasks described in this manual require the persons to whom the tasks
were assigned to have different qualifications.
Only persons who can be expected to reliably complete the tasks are approved for all
work. Persons whose reactions are impaired due to drugs, alcohol or medication, for
example, are not approved.
Assembly instructions for the RK MultiControl II duo accu/DC control
⮱
Section "Maintenance plan" on page 237
WARNING!
Danger in the event of insufficiently qualified persons!
Insufficiently qualified persons are unable to assess the risks
associated with handling the RK MultiControl II duo accu/DC and
thus put themselves and others at risk of severe or fatal injury.
– Only have suitably qualified persons carry out all work.
– Insufficiently qualified persons must be kept away from the
work area.
143