Installing the RK MultiControl II duo accu/DC onto the substrate

Staff:
Protective equipment:
◼ The surface must be ready for fastening the control.
Prerequisite:
1.
Drill 4 holes (diam. 5.5 mm) in the surface as per the spacing shown in Figure 18.
2.
Place the control on the surface and position it.
3.
Insert the 4 screws into the drilled holes and tighten them alternately in diagonal
⇨ Installation is complete.
sequence.
Assembly instructions for the RK MultiControl II duo accu/DC control
◼ Assembly staff
◼ Protective clothing
◼ Protective gloves
◼ Safety shoes
Figure 21 - Connection points
The screws are not included.
Information on selecting screws:
– Screws with cylindrical contact surface
– Strength 8.8
– Screw head diameter: 8 - 10.0 mm
– Screw diameter: 5.5 mm
– Through depth: 20.5 mm
– Tightening torque: 1.5 Nm