Herunterladen Inhalt Inhalt Diese Seite drucken

Internal Battery Installation - Orbea Blue Paper Rise Hydro 2022 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für BLUE PAPER RISE HYDRO 2022:
Inhaltsverzeichnis
86 | ORBEA
4
9
10. Carefully pull from the ziptie attached to the inter-
nal battery to pull the battery from the frame until
11. Disconnect the battery connection cable by turning
10
TECHNICAL MANUAL
9.
11
B LUE PAP ER R I SE · HYDRO 2022
12

INTERNAL BATTERY INSTALLATION

To install the internal battery back into the frame, follow
Check the cable routing and torque setting of all compo-
For the correct lockring and crank arms installation, con-
sult the manufacturer´s documentation:
ORBEA | 87
12.
E-Thirteen Plus EP8 Cranks:
-
cles/360058908731-Shimano-E-spec-Crank-Manual
Shimano FC-EM900/FC-EM600 Cranks:
E N
Inhaltsverzeichnis
loading

Inhaltsverzeichnis