Herunterladen Inhalt Inhalt Diese Seite drucken

Adding A 32 I/O Box - Aventics HF03 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für HF03:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
74
AVENTICS | HF03/HF02 | 1987765493–BDL–001–AB
Conversion and extension
See section 4
See section 2 in the bus
coupler operating
instructions
See Fig. 11
See section 4
See section 2 in the
bus coupler operating
instructions
6. Screw the left side cover back on after the last I/O module
(3 hexagon socket-head screws, DIN 912 M4, wrench
width 3).
Tightening torque: 2.5 ... 3.0 Nm
7. Make the connections
8. If the sequence of I/O modules was changed: adjust the bus
master configuration.
6.3

Adding a 32 I/O box

Please note the following if expanding the valve system
by a 32 I/O box:
Applied voltage
Danger of injury from electric shocks.
O
No input/output modules may be mounted on the valve
system.
O
Make sure the relevant system component is not under
voltage or pressure.
1. Remove the left side cover from the valve system's bus
coupler (3 hexagon socket head screws, DIN 912 M4, wrench
width 3).
2. Put the 32 I/O box in place and screw it tight (3 hexagon socket
head screws, DIN 912 M4, wrench width 3).
Tightening torque: 2.5 ... 3.0 Nm.
3. Reestablish connections.
4. Adjust the bus master's configuration.
CAUTION

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Hf02

Inhaltsverzeichnis