Install the rack guide fastening bolt.
Tightening Torque : 3.9-4.9 N-m
Install the plunger spring and spring retainer (B).
Spring retainer (B).
Spring.
3.3.2. Re-assembling Cam Shaft
Install the transmission shaft CMP.
Attaching transmission shaft CMP
Apply molybdenum disulfide to the shaft section.
Check that the transmission shaft rotates
Install the camshaft.
30