Install Out-FloPak
2.7.6
Out-FloPak Lever and slide the Out-FloPak over the triangular shaft. While releasing the Lever, ensure
the Out-FloPak is flush with the front of the console. The system will detect and display a '
DETECTED' icon on the Setup screen when the Out-FloPak has been properly installed.
Figure 26a: Depress Out-FloPak Lever
2.7.6.1
2.7.6.2
24
Fluent Pro Fluid Management System
Connect the yellow outflow luer connector to the hysteroscope Outflow Channel.
Connect the yellow suction connector onto the Under-Buttocks Drape (UBD) Port.
Figure 27: Connect UBD Suction Connector
Procedure Setup
Figure 26b: Slide Out-FloPak over Shaft
English