Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Batch Function; Installation Stroke Signal; Connector Assignments Terminal X2 - ECOLAB Elados EMP IV E60 serie Betriebsanleitung

Membran-dosierpumpe
Vorschau ausblenden Andere Handbücher für Elados EMP IV E60 serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7.2.4.5

Installing the batch function

7.2.4.6

Installation stroke signal

7.2.5

Connector Assignments Terminal X2

Terminal Conductor coloring
13
14
15
16
17
18
19
20
21
22
23
24
417101799_EMP_IV_E60.docx
Assignment
(cable connection)
Anode
brown
connection)
white
Output 5V DC
input, diaphragm burst
blue
detector
black
GND
Idle
idle
Output 5V DC
Input for metering
monitoring
GND
Dongle- sending line
Dongle- receive line
Idle
4
+
7
=
Terminal
4
7
4
+
5
+
7
= Input batch function with electronic
Terminal
4
5
7
Fig. 7.23
Installing the batch function
11
+
12
= Output stroke signal
Terminal Assignment
11
12
The contact is closed once with each stroke of
the pump.
potential-free transistor output,
load: max. 24 V, DC, 300 mA
Fig. 7.24
Installing stroke signal
Fig. 7.25
Connector Assignments Terminal X2
(for sensor with anode
Connection
diaphragm
burst detector
(optional)
Metering
monitoring
- 85 -
Input batch function with potential-
free contact
Assignment
Relay input batch function
GND ( ┴ )
switch (NPN)
Assignment
Relay input batch function
5 V, DC
GND ( ┴ )
Output stroke signal (+)
Output stroke signal (–)
Connection for Dongle-
Plate E60
PLUS
(see also chapter:
„Fitting the Dongle-plate
E60
PLUS
")
Fig. 7.26
Dongle Plate
Rev. 11-10.19
8.1

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iv e60Elados emp iv e60 plus

Inhaltsverzeichnis