Calibration Pump; Preparation; Calibration / Start; Plus ) - ECOLAB Elados EMP IV E60 serie Betriebsanleitung

Membran-dosierpumpe
Vorschau ausblenden Andere Handbücher für Elados EMP IV E60 serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

10.4.2

Calibration pump

10.4.2.1

Preparation

Fig. 10.45 Calibration Pump / Preparation
10.4.2.2

Calibration / Start

Fig. 10.46 calibration / Start
to
:
The pump runs 122 strokes (ca. 1 min).
The strokes are counted down from 122 to 0.
NOTE
By activating the 'Menu/Exit' function, the running calibration can be interrupted.
to
:
After the running process, the amount removed from the measuring cylinder
(see chapter
This quantity is then entered as the calibration value (in ml or l).
10.4.3
Calibration pump with oval gear meter (OGM
If a dongle plate and an oval gear meter are connected and the "oval gear meter" function
(see chapter
is activated, the oval gear meter pulse rate recorded is automatically displayed at the end of
the calibration process.
This is offset against the specified calibration value. A correlation thus occurs between the
oval gear meter pulses and the metered quantity.
417101799_EMP_IV_E60.docx
10.4.2.1
"Preparation") must be read off.
10.3.11
"Configuration / Oval gear meter (only E60
 Connect the pump ready for operation on
pressure side
(see chapter
7
"Device installation").
 Fill a suitable measuring cylinder and insert the
suction line.
The volume of the measuring cylinder
should be 1/50 of the metering pump rate in
litres/h.
During this process, the suction tube must
not change its position.
The calibration of the metering pump is only
valid for the currently set stroke length
setting. After changing the stroke length, the
calibration must be performed again.
PLUS
)
- 108 -
& OGM or OGM
PLUS
PLUS
Rev. 11-10.19
)")