10.4.3.1

Preparation

Fig. 10.47 Calibration / Pump with OGM / Preparation
10.4.3.2

Calibration / Start

Fig. 10.48 Calibration / Pump with OGM / Calibration / Start
to
The pump runs 122 strokes (ca. 1 min).
The strokes are counted down from 122 to 0.
The oval gear meter pulses (OGM pulses) are counted upwards from 0.
By activating the 'Menu/Exit' function, the running calibration can be interrupted.
NOTE
If the OGM pulses are not displayed, check all the connections to the pump!
to
:
After the running process, the amount removed from the measuring cylinder
(see chapter
This quantity is then entered as the calibration value (in ml or l).
417101799_EMP_IV_E60.docx
 Connect the pump ready for operation on the
 Fill a suitable measuring cylinder and insert the
10.4.3.1
"Preparation") must be read off.
Fig. 10.49 OGM Pulses
During the calibration process, the oval gear pulses
determined appear on the display.
- 109 -
pressure side
(see chapter
7
"Installing the device").
suction line.
The volume of the measuring cylinder
should be 1/50 of the metering pump rate in
litres/h.
During this process, the suction tube must
not change its position.
The calibration of the metering pump is only
valid for the currently set stroke length
setting. After changing the stroke length,
the calibration must be performed again.
Rev. 11-10.19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iv e60Elados emp iv e60 plus

Inhaltsverzeichnis