7.2.5.2
Installation of pulse activation (water meter)
7.2.5.3
Installation of standard signal activation
7.2.5.4
Installation of activation via a metering lock
The metering lock input must be activated in the menu (see chapter
NOTE
Metering lock ") and is available in all operating modes.
7.2.5.5
Installation of the batch function
417102214_EDPL_V60.docx
Fig. 7.23
6
+
7
=
Pulse input with a floating contact
Terminal
6
7
5
+
6
+
7
= Pulse input with an electronic switch (NPN)
Terminal
5
6
7
The minimum pulse or break duration is 15 ms.
Fig. 7.24
9
+
10
=
Standard signal input 0/4 – 20 mA
Terminal
Assignment
9
0/4...20 mA +
10
0/4...20 mA -
Fig. 7.25
8
+
7
= Metering lock input with a floating contact
Terminal
Assignment
8
Metering lock switch input
GND ( ┴ )
7
5
+
8
+
7
= Metering lock input
with an electronic switch (NPN)
Terminal
Assignment
5
5 V, DC
8
Metering lock switch input
GND ( ┴ )
7
Fig. 7.26
4
+
7
=
Batch metering input with a floating contact
Terminal
Assignment
4
Batch metering switch input
GND ( ┴ )
7
5
+
4
+
7
= Batch metering input
with an electronic switch (NPN)
Terminal
Assignment
5
5 V, DC
4
Batch metering switch input
GND ( ┴ )
7
77
Assignment
Pulse switch input
GND ( ┴ )
Assignment
5 V, DC
Pulse switch input
GND ( ┴ )
10.4.8
"Configuration /
Rev. 1.12.11