Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting; Mounting Diagram - ECOLAB Elados EMP IV E60 serie Betriebsanleitung

Membran-dosierpumpe
Vorschau ausblenden Andere Handbücher für Elados EMP IV E60 serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6

Mounting

• The metering pump should be fitted in an easy-to-access, frost-free location.
The ambient temperature must not exceed +40° C.
• The mounting position of the device must be horizontal.
• The pump must be securely screwed to the bracket or the container using the drill holes
provided (for information on the drill hole gap, see chapter
In accordance with DIN EN 809 5.2.1.4, we inform you that the pump can lose its
stableness and fall in every direction as a result of an inclination angle of 10 or more
WARNING
degrees, if it is not tightly screwed to the ground (e. g. during transport, mounting or
demounting). Hence, as long as the pump is not tightly screwed to the ground, appropriate
safety measures have to be taken for preventing the pump from overturning.
6.1

Mounting diagram

The metering valve, pressure control valve and pressure relief valve can be replaced by a
NOTE
multifunction valve (MFV) from our product range, which combines all of these
functionalities.
417101799_EMP_IV_E60.docx
Pos.
Designation
1
Overflow valve
2
Pressure control valve
3
Replacement method: Multifunction valve
4
Suction pipe / bottom admission valve
Fig. 6.1
Mounting diagram
- 77 -
14.2
"Dimensions")
Rev. 11-10.19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iv e60Elados emp iv e60 plus

Inhaltsverzeichnis