Herunterladen Diese Seite drucken

KKT KOLBE HKW10NVP3 Benutzerhandbuch Seite 251

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Connector assembly of the AC cables
• Insert the respective conductor into the suitable fer-
rule acc. to DIN 46228-4 and crimp the contact (2).
• Unscrew the swivel nut of the respective AC plug from
the threaded sleeve (3.1)
and thread the swivel nut and threaded sleeve over
the AC cable (3.2).
• Insert the crimped conductors into the corresponding
terminals and tighten the screw with a hex key wrench
screwdriver (size: 2.5, 1.2~2.0 N.M) (4).
For this purpose, note the markings in the plug;
connect the outer conductor phase L1 (usually brown)
to the L1 or R bracket, L2 (usually black) to L2 or S
and L3 (usually grey) to L3 or T, the neutral conductor
(blue) to the N terminal and the mains earth conduc-
tor (green-yellow) to the PE terminal.
Ensure that all conductors are securely in place
in the screw terminals on the bush insert.
• Screw the swivel nut onto the threaded sleeve (5).
This seals the AC connector and provides strain relief
for the AC cable.
When doing so, hold the bush insert firmly by the
locking cap to ensure a tight screw connection.
• Assembly the plug shell and the adapter as shown in
the figure (6).
Push the adapter and shell by hand until a "click"
is heard or felt.
Connecting the System
2
3.1
3.2
4
5
6
L1
L2
L3
N
PE
115

Werbung

loading

Diese Anleitung auch für:

Kktnvb5.1