Herunterladen Diese Seite drucken

KKT KOLBE HKW10NVP3 Benutzerhandbuch Seite 244

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting the System
8.2 Mounting preparation
Observe the following instructions when preparing for installation:
• Follow the instructions given in the chapters "Packing list" and
"Notes before use" before installing the energy storage system.
• Have the following ready to install the system:
• Units and accessories supplied (see "Packing list") ,
including this manual
• Cross-head screwdriver
• Allen key
• Rubber mallet
• Wire stripper (for later connection)
• Crimping pliers (for later connection)
• Drill + drill bit with diameter
according to the assembly material
• Measuring tools including spirit level
• Multimeter (for later connection, for testing)
• Pencil or similar for markings
• Protective gloves or similar
• Check the condition and current carrying capacity
of your electrical cables with regard to the requirements
specified in the technical data.
108

Werbung

loading

Diese Anleitung auch für:

Kktnvb5.1