Herunterladen Inhalt Inhalt Diese Seite drucken

Equipment Setup; Zeroing The Manometer - Codman Hakim Bedienungsanleitung

Präzisionsventil
Vorschau ausblenden Andere Handbücher für Hakim:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 37
One male luer connector with 1/16 in barb
Saline solution
Flushing Procedure
Prepare the valve following Steps 1 through 7 in SiphonGuard Device
Functional Testing, Flushing Procedure.

Equipment Setup

1.
With the valve submerged in a water bath, disconnect the valve from
the tubing leading to the stopcock
2.
Place the end of the tubing leading from the stopcock into the water
bath Position the tubing so that the end does not come into contact
with the sides of the bath
3.
Adjust the manometer height so that the zero level of the manometer
and the fluid level in the water bath are at the same level (Figure A-5)
Manometer Zero
Level
Figure A-5
4.
Fill the syringe with saline solution using the syringe filter
5.
Disconnect the filter from the syringe and reconnect the syringe to
the stopcock
6.
Turn the stopcock to isolate the valve from the manometer assembly,
connecting the syringe to the manometer (Figure A-6)
Figure A-6
7.
Refill the manometer using the 5 cc syringe

Zeroing the Manometer

1.
After refilling the manometer, turn the stopcock to connect the
manometer with the bath (Figure A-7)
Figure A-7
2.
Allow the water column in the manometer to fall The water column
should stop at the zero level of the manometer (Figure A-5)
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis