Herunterladen Inhalt Inhalt Diese Seite drucken

Mounting; Mounting Diagram - ECOLAB Elados EMP III E60 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Elados EMP III E60:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting

6
The installation must only be performed by authorized personnel and the general guidelines
WARNING
and local installation regulations must be observed!
• The metering pump should be fitted in an easy-to-access, frost-free location.
The ambient temperature must not exceed +40° C.
• The mounting position of the device must be horizontal.
• The pump must be securely screwed to the bracket or the container using the drill holes
provided (for information on the drill hole gap, see chapter
CAUTION
6.1

Mounting diagram

NOTE
417101441_EMP_III_E60.docx
In accordance with DIN EN 809 5.2.1.4, we inform you that the pump can lose its
stableness and fall in every direction as a result of an inclination angle of 10 or more
degrees, if it is not tightly screwed to the ground (e. g. during transport, mounting or
demounting). Hence, as long as the pump is not tightly screwed to the ground,
appropriate safety measures have to be taken for preventing the pump from overturning.
Pos.
Fig. 6.1
The metering valve, pressure control valve and pressure relief valve can be replaced by a
multifunction valve (MFV) from our product range, which combines all of these
functionalities.
Designation
1
Overflow valve
2
Pressure control valve
3
Replacement method: Multifunction valve
4
Suction pipe / bottom admission valve
Mounting diagram
- 77 -
"Dimensions")
14.2
Rev. 12-08.18

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Elados emp iii e60 plus

Inhaltsverzeichnis