Herunterladen Inhalt Inhalt Diese Seite drucken

Prophete CITY Bedienungsanleitung Seite 98

Vorschau ausblenden Andere Handbücher für CITY:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
GEARSHIFT
left side of the bicycle with a screwdriver.
6. Release the axle nuts on both sides of the rear wheel with a
15 mm wrench.
INSTALLING THE REAR WHEEL
1. Use the shifting lever to put in the 1st gear.
2. Place the chain on the pinion.
3. Place the rear wheel into the drop-out. Ensure that the wheel
is placed straight in the holder and that the chain is appro-
priately tensioned.
(see chapter Chain tensioning).
4. Apply the safety washer
that the interlock is in the drop-out.
5. Push the washer onto the right side of the axle.
6. Attach the wheel with the axle nuts on both sides. Tighten
them with a 15 mm wrench (see chapter Torque specifica-
tions).
7. Attach the counter-holder bracket on the left side with the
pipe clamp screw connection
8. Push the switching pin into the axle guide on the right to the
stop.
9. Ensure that the 1st gear is engaged.
10. Push the switchbox onto the right axle nut as shown (fig. AW).
11. Fasten the switchbox with the lower attachment nut
12. Set the gear shift (s. chapter Gearshift).
EN
36
(fig. AZ) on the left of the axle so
2
(fig. AZ) at the frame.
1
AY
1
AZ
1
(fig. AY).
1
2
3
2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis