Detailed description of pos. 5
Figure
1 1/2" complete pre-assembled
discharge pipework for MOG:
– 1 x flexible connecting piece with
– 1 x hose nozzle Rp 1 1/2 / DN 40
– 1 x isolating valve (ball) R 1 1/2
– 2 x double nipple Rp 1 1/2
– 1 x non-return valve (ball) R 1 1/2
– 1 x bend 90 ° Rp 1 1/2 / R 1 1/2
Note: The oval flange with 1 1/4" inner
thread is supplied with MOG.
See section
Figure
1 1/2" complete pre-assembled
discharge pipework for MDG:
– 1 x flexible connecting piece with
– 1 x hose nozzle Rp 1 1/2 / DN 40
– 1 x isolating valve (ball) R 1 1/2
– 1 x cross piece Rp 1 1/2
– 1 x blind cover Rp 1 1/2
– 2 x long nipple R 1 1/2
– 2 x bend 90 ° Rp 1 1/2 / R 1 1/2
– 2 x double nipple R 1 1/2
– 2 x non-return valve (ball) R 1 1/2
– 2 x bend 90 ° Rp 1 1/2 / R 1 1/4
Note: Two oval flanges with 1 1/4"
inner thread are supplied with MDG.
See section
Description
2 clamps DN 40
2. Scope of
delivery.
Description
2 clamps DN 32
2. Scope of
delivery.

7.2 Guidelines for installation of lifting station

The guidelines for correct mechanical installation of a lifting
station are according to EN 12056-4.
See section
7.1.1 Installation
sketch.
Install the lifting station in a properly lit and vented room with
60 cm free space around all parts to be serviced and operated.
Provide a pump sump below the floor level. If a lifting station is
installed in a basement with the risk of penetrating
groundwater, it is advisable (in certain countries required) to
install a drainage pump in a separate pump sump below floor
level in order to drain the room. See fig. 18.
The collecting tank, pump and cables may be
Note
flooded (max. 2 m for 7 days).
The controller must be installed in a dry and well
Caution
ventilated place.
All pipe connections must be flexible to reduce resonance.
Lifting stations must be secured against uplift and twist.
All discharge pipes from lifting station, diaphragm pump and
drainage pump must have a bend above the local backwater
level. The highest point of the bend/reversed water seal must
be above street level. See fig. 18.
For discharge pipes, DN 80 and upwards, install an isolating
valve in the discharge pipe. Also provide an isolating valve in
the inlet line.
Surface water must not be discharged into the lifting station
inside the building. It should have its own pumping station
outside the building.
Lifting stations must be provided with an approved non-return
valve according to EN 12050-4.
The volume of the discharge pipe above the non-return-valve
up to the backwater level must be smaller than the effective
tank volume.
In general, a lifting station for black wastewater must be
vented above roof level. However, it is permitted to lead the
ventilation, as a secondary ventilation, into the main building
ventilation system. Special venting valves (accessory) should
be placed outside the building.
If the wastewater is discharged into a collecting line, this
collecting line must have a filling ratio of at least h/d = 0.7.
The collecting line must be at least one nominal diameter
bigger after the discharge pipe connection.
The controller must be placed in a flood safe place and be
equipped with an alarm.
Use a diaphragm pump for simple, manual draining of the
collecting tank in case of pump failure (not obligatory).