Initial testing
The installer is required to measure impact forces and select on the control unit the appropriate speed and torque
12445.
Make sure that the provisions in "GENERIC WARNINGS" are observed.
• Turn on the power supply.
• Check that the automation system motors rotate in the correct direction. If the movement of the doors is incorrect,
change the value of par.
• Check that all connected controls are working correctly.
• Check travel and deceleration.
• Check that the safety devices are activated correctly.
•
gate leaves must not move.
• If the battery kit is installed, disconnect from mains and check that the batteries are working.
• Disconnect from mains power and disconnect the batteries (if used), then reconnect. Check the correct completion
of the position recovery phase when opening and when closing.
18
Declaration of Conformity
The undersigned Dino Florian, legal representative of Roger Technology - Via Botticelli 8, 31021 Mogliano V.to (TV)
DECLARES that the F70/IPU36 digital control unit is compliant with the provisions established by Community directi-
2014/30/UE
2014/35/UE
2011/65/UE
EN 61000-6-3
EN 61000-6-2
EN 60335-1
116
or
.
| 22.