Herunterladen Inhalt Inhalt Diese Seite drucken

Eliwell ICPlus 915 Bedienungsanleitung Seite 9

Vorschau ausblenden Andere Handbücher für ICPlus 915:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 94
UNINTENDED EQUIPMENT OPERATION DUE TO CONNECTION
Signal leads (probes, digital inputs, communication and the signal electronic supply) must be routed separately from power and supply
cables.
Failure to follow these instructions can result in death, serious injury, or equipment damage.
NTC/PTC/Pt100 probes have no connection polarity and can be extended using a normal bipolar cable (Note that extending
the probes burdens the behaviour of the instrument in terms of EMC electromagnetic compatibility: specifically, if Pt100
probes with cable longer than 3 m (9.84 ft) are used, an extreme care must be taken during wiring operations).
WARNING
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis