Herunterladen Inhalt Inhalt Diese Seite drucken

Service Information; Manual Release Cable Adjustment; Filling The Reservoir - Stryker Power-PRO IT 6510 Bedienungs- Und Wartungshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 175

MANUAl RElEASE CABlE ADJUSTMENT

Tools Required:
8 mm Combination Wrench
10 mm Wrench
Procedure:
1.
Support the litter so no weight is on the base.
2.
Ensure that the cable is intact.
3.
Using a 10 mm wrench, loosen the cable lock nut.
4.
Using a 8 mm hex wrench, adjust the tension on the manual release cable.
5.
Tighten cable lock nut.

FIllING THE RESERVOIR

Use only Mobil Mercon
Synthetic Blend Oil (6500-001-293)
®
Note: Any time you work with the hydraulics you may lose some oil.
Tools Required:
3/16" Allen Wrench
Procedure:
1.
Raise the cot to the full up position.
2.
Ensure that the fill port is horizontal and lined up with the hole in the motor mount.
3.
Remove the port plug using a 3/16" Allen wrench.
4.
Fill the reservoir up to the bottom of the fill port.
5.
Replace the plug and run the cot up and down a few times.
www.stryker.com

Service Information

6510-009-005 REV A
Return To Table of Contents
1-73
English

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis