Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

GC, GC/MS, and ALS
Site Preparation Guide
1
7890 Series GC Site Preparation
Customer Responsibilities
Installation Kits
Hydrogen Gas
Dimensions and Weight
Power Consumption
Heat Dissipation
Exhaust Venting
Environmental Conditions
Gas and Reagent Selection
Gas and Reagent Purity
Gas Supplies
GC/MS Gas and Reagent Requirements
Gas Plumbing
Cryogenic Cooling Requirements
Maximum Length of Cables and Hoses
Site LAN Network
PC Requirements
This section outlines the space and resource requirements for GC, GC/MS, and
automatic liquid sampler (ALS) installation. For a successful and timely
installation of the instrument, the site must meet these requirements before
beginning installation. Necessary supplies (gases, tubing, operating supplies,
consumables, and other usage-dependent items such as columns, vials,
syringes, and solvents) must also be available. Note that performance
verification requires the use of helium carrier gas. For MS systems using
chemical ionization, methane reagent gas or methanol (for internal ionization
ion traps) is also required for performance verification. Refer to the Agilent
Web site at
www.agilent.com
ALS supplies and consumables.
For 7697A Headspace Sampler site prep specifications, refer to the
Prep
Guide.
8
9
11
12
19
24
25
28
30
34
35
43
52
57
59
for the most up-to-date listing of GC, GC/MS, and

Agilent Technologies

38
56
7697A Site
7

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

MsGc

Inhaltsverzeichnis