Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

GC, GC/MS, and ALS
Site Preparation Guide
3
7820 MSD Site Preparation
This section outlines the space and resource requirements for a 7820
installation. For a successful and timely installation of the instrument, the site
must meet these requirements before beginning installation. Necessary
supplies (gases, tubing, operating supplies, consumables, and other
usage-dependent items such as columns, vials, syringes, and solvents) must
also be available. Note that performance verification requires the use of
helium carrier gas.Refer to the Agilent Web site at
the most up-to-date listing of GC and ALS supplies and consumables.
For a general 7820A GC-only installation, refer to its documentation.
104
108
110
115
116
118
119
120
121
125
134
135
136

Agilent Technologies

106
123
www.agilent.com/chem
for
103

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

MsGc

Inhaltsverzeichnis